SAFETY AND PROTECTION IN THE MANAGEMENT OF THE RAILWAY TRACTION
RAYLWAYS| SUBWAYS| TRAMWAYS | TROLLEY-BUS
Subway earthing and short circuit mobile device for contact lines 3 kVdc – with four elements for the B.1 line
COMPOSITION:
No. 1 light alloy contact clamp with foldable jaw and screw tightening equipped with aluminum torque limiter bound to the active part, length 1,14 m |
No. 3 insulating sticks in epoxy resin, base and extension, length 1,15 m each, to be assembled through press button joint, provided with hand guard and end cap with strengthened joint for the connection to the aluminum pipe. |
Total length of the device: 4,6 m |
No. 1 extra-flexible copper cable, sec. 95 mm2 length = 6 m covered with transparent silicone. |
No. 1 clamp for the tightening to rails provided with torque limiter for the tightening of the clamp to rails. |
No. 1 nylon bag with shoulder belt for the transfer. |

Download technical sheet
In accordance to STD IEC 61230
Ref./Conf. STF RFI DMA IM TE SP IFS 083 – Cat. 817/602 derived for METRO B1-ROME
Our Mod. CCLC-SDN/95/4-6m-METROB1
Cable sec. mm2 | Icc 0,25s | Icc 0,5s | Icc 1s |
---|---|---|---|
95 | 40 kA | 35 kA | 25,2 kA |