SAFETY AND PROTECTION IN THE MANAGEMENT OF THE RAILWAY TRACTION
RAYLWAYS| SUBWAYS| TRAMWAYS | TROLLEY-BUS
Earthing and short circuit for MT plants in bare conductors of railway substations AC side
COMPOSITION:
No. 3 brass clamps with hexagonal threaded coupling CH12, bayonet or DIN and tightening: – ø 3÷50 mm on cylindrical conductors – Thickness max 55×35 mm on flat bars – Thickness max 35×60 mm on slanted bars – Spherical fixed points ø 20/25 mm |
No. 3 copper cables sec. 25/50/95 mm2 length = 1÷5 m covered with silicone sheath |
No. 1 three-polar insulated connector |
No. 1 earthing cable sec. 16/25/35 mm2 and length = 0÷2 m covered with silicone cable |
No. 1 earthing brass clamp with screw tightening on thickness 0÷50 mm and/or spherical fixed points ø 20/25 mm |
No. 1 telescopic insulating stick length = 1/1,5 m or in two/three elements 1,5 m long each, joinable with aluminum joint and stop ring |
No. 1 metal box |
No. 1 nylon bag with shoulder belt for the stick |

Download technical sheet
In accordance to STD IEC 61230
Ref./Conf. STF RFI DPRIM STF IFS 020
Our Mod. CCCA D/B/E
Cable sec. mm2 | Icc 0,25s | Icc 0,5s | Icc 1s |
---|---|---|---|
25 | 13,7 kA | 8 kA | 5,6 kA |
50 | 22,5 kA | 18 kA | 12,7 kA |
95 | – | 35 kA | 25,2 kA |